background image

DS4-2731C 

- 4 -

   

4. Major specifications 

                                                             

       

 

Item Specifications 

Model 

SOT-MQ162A/B SOT-MQ82A/B 

Operating environment 

CC-Link Ver.1.10/Ver.2.00 

Data transfer rate 

156k, 625k, 2.5Mbps 

Supply voltage 

Rated voltage: 24VDC, 10% or less ripples 
Operating voltage: 18-30VDC, 30V or less at peak including ripples 

Current consumption 

Less than 150mA 

Interface RS485 

compliant 

Transmission mode 

Semi-duplex, bi-directional 

Communication control 
mode 

Bit forward 

# of occupied stations  When using the monitoring function: 1 

When not using the monitoring function: 0 

Transmission distance 

0.2-160m 0.2-80m 

Detection angle 

1° (horizontal and vertical) 1° 

(horizontal and vertical)

 

Modulation mode 

FSK 

Projector element 

Near infrared light emitting diode (870nm in wavelength) 

Receiver element 

Photo diode 

Auxiliary outputs 

CDO: On when data is received. 
ALM: Off when the reception level is low. 

A photo-coupler insulated, NPN open collector output 
Rated output level: 30VDC, 50mA max. 

Electric connections 

For CC-Link signals: 4-pin connector terminal block

   

(

PHOENIX MSTB 2,5/4-GF-5,08

For power supply and auxiliary outputs: 5-pin connector terminal block

 

(

PHONEIX MSTB 2,5/5-GF-5,08

)

 

Check terminals 

Applies an output DC voltage corresponding to the reception level. 
(Use the DC voltage range of a 10k

/V or higher tester.) 

Operating ambient 
illumination 

Sunlight 

: 10,000 lx or less 

Fluorescent or candescent lamps : 3,000 lx or less 
No ambient light shall directly enter the receiver. 

Operating ambient 
temperature 

-10-55°C 

No frozen parts allowed. 

Operating ambient 
humidity 

10-85% RH No condensation allowed. 

External dimensions 
(weight) 

See “External dimensions” (approx. 350g). 

Accessories 

A set of fittings, mounting screws (4),   
signal plug (1), power/auxiliary output plug (1),   
110

 terminal resistors (2) and 130

 terminal resistors (2) 

 

Содержание SOT-MQ162 Series

Страница 1: ...DS4 2731C 1 CC Link Space Optical Repeater SOT MQ82 162 series Operation Manual TOYO ELECTRIC CORPORATION...

Страница 2: ...ts and their functions 5 6 Data linking procedure 6 6 1 Procedure 6 6 2 Setting the switches 7 6 3 Installation 8 6 4 Electric connections 11 6 5 Beam path adjustment 14 6 6 Monitoring function 14 7 E...

Страница 3: ...d 4 Dip switch allows to switch the channel to the one having different carrier frequency and to communicate with up to two opposite directions in series or parallel without interference 3 Constructio...

Страница 4: ...uts CDO On when data is received ALM Off when the reception level is low A photo coupler insulated NPN open collector output Rated output level 30VDC 50mA max Electric connections For CC Link signals...

Страница 5: ...a from cable indicator RD1 Shows green when data is received from the cable 10 Received from optical unit indicator RD2 Shows green when data is received from the optical unit 11 Channel indicator CH...

Страница 6: ...and dedicated CC Link cables See subsection 6 4 Beam path adjustment Adjust the beam path while checking the CD and level indicators on each SOT unit See subsection 6 5 Setting the master unit Set up...

Страница 7: ...es 1 Detail of settings 2 Detail of settings 10 1 x10 Set to the first digit value of the station number X1 Set to the second digit value of the station number Set to 00 when using the monitoring func...

Страница 8: ...e rating 4 a device generating a strong magnetic field e g magnet or motor or a device or power wire generating strong noises e g inverter is used nearby 5 the sunlight or incandescent light containin...

Страница 9: ...2 This setup does not cause interferences unless disturbed by any reflective object Example 3 3 Same condition is applicable as Example 1 when the channel is different Caution Note that the severity o...

Страница 10: ...DS4 2731C 10 6 3 4 Installing directions Install the SOT units in the opposite directions as shown in 1 below They do not work if rotated as shown in 2 or 3...

Страница 11: ...ge drop across the cable and use it within a length not exceeding 50m 6 4 2 Signal connector Signal name Code Terminal number Signal A DA 1 Signal B DB 2 Signal ground DG 3 Shielded SLD 4 Arrangement...

Страница 12: ...ee the User s Manual for the master unit 3 For the units at either ends of each segment always connect the terminal resistor between DA and DB The SOT units themselves contain no terminal resistor Use...

Страница 13: ...he CC Link cable in the vicinity of the optical transmission device This ferrite core must have attenuation characteristics equivalent to those of the TDK ZCAT3035 1330 ferrite core Please note that t...

Страница 14: ...opposite unit in the same manner 6 When installing a unit on a moving object such as stacker crane check that the reception level indicators on both the moving and fixed units show green at level 3 or...

Страница 15: ...the station number of SOT MS162A to 1 and that of SOT MS162B to 2 3 Program the automatic refreshing RX refreshing device X1000 RY refreshing device Y1000 4 Set parameters Station type Remote I O of o...

Страница 16: ...DS4 2731C 16 7 External output circuit 1 DA 2 DB 3 DG 4 SLD 4 Terminal No Abbrev CDO 5 ALM 2 GND FG 1 24V 3 COM Signal connector Power auxiliary output connector Terminal No Abbrev...

Страница 17: ...set Data cannot be transmitted for about two seconds after power up 3 Beam path adjustment When installing the SOT units never fail to adjust the beam path Data can be transmitted when the clear data...

Страница 18: ...DS4 2731C 18 10 External dimensions As removed from bracket 5 x 12 oblong hole Receiver port Projector port 5 x 12 oblong hole...

Страница 19: ...a failure of the product 12 Contact For detail of the product please contact the nearest sales office or the Kagiya Factory TOYO ELECTRIC CORPORATION Kagiya Factory Head office Kagiya Factory 1 39 Az...

Страница 20: ...Link version added Development 1 2010 07 26 Editorial errors with addresses in 12 Contact corrected Development 1 2011 04 22 Page 1 CE mark added Page 13 6 4 4 Measures to be taken to comply with the...

Отзывы: