  310317-20  TCVT.PVCV

5056.42665-A

Vertical vent pipe: 

1.5 in. (38mm)

Horizontal vent pipe:  Top   

1.5 in. (38mm)

 

Sides  

1.5 in. (38mm)

 

Bottom 

1.5 in. (38mm)

All other clearances are as per the fireplace installation instructions.

VENT PIPE

This kit uses either Simpson Duravent GS direct vent pipe, Secure Vent direct vent pipe,  Selkirk Direct-temp 
vent pipe or ICC Excel Direct vent pipe with a 5” inner pipe and an 8” outer pipe. For part numbers see the 
table of venting components on page 10 of this manual.

CAUTION: The adjustable vent restrictor located on the underside of the firebox top must be fully open. 
 
 

The vertical standoff can only be installed on a flat surface. Sloped surfaces require the construction of a 
chase which provides the minimum interior, square opening of 11” x 11” for the venting and wiring to pass 
through. Flat roofs may require a chase depending on local codes and roof construction. (If in doubt check 
with local inspector). The terminal must be located in accordance with the clearances outlined in Figure 1.

under no circumstances shall a rheostat be used to alter the voltage supply to this unit.

 Minimum Clearances to Combustibles 

3

 Vertical (Through Roof) Venting 

Installation:

All part numbers in the following section are shown in Figure 3. 

1.  Place the flashing onto the chase and seal using silicone. 

2.  Put a bead of silicone on the underside of the vertical standoff and place it on top of the flashing. Align the 

eight holes and secure both parts to the chase using eight #8 x 1 1/2” screws provided. 

3.  Install the drip shield onto the top of the vertical standoff using a bead of silicone between the two. Do not 

screw this part in place. 

4.  Bring the 14-2 electrical wire (not supplied) up through the holes in both the flashing and the drip shield 

leaving at least 12” of excess wire above the drip shield. 

5.  IMPORTANT: Attach an appropriate length(s) of the vent to the power vent terminal, sufficient to pass 

through the chase. 
 

NOTE: DO NOT CONNECT AN ADJUSTABLE LENGTH VENT PIPE TO THE TERMINAL. 

6.  Seal the connection of the first length of pipe at the terminal and any other pipe to pipe joint by both 

screwing and taping the outside joint using high temperature foil tape. 

7.  Remove the junction box cover. 

 

8.  Remove and discard the exhaust outlet. 

 

Содержание TCVT.PVCV

Страница 1: ...tionsaresupplementarytotheInstallationand OperatingInstructionssuppliedwiththefireplaceandshould be kept together Refer to the Installation and Operating Instructions for proper gas supply safety requirements and operating instructions TCVT PVCV 5056 42665 A 310317 20 Visit www townandcountryfireplaces net for the most recent version of this manual ...

Страница 2: ... rheostat be used to alter the voltage supply to this unit Locate the fireplace as per the main instructions supplied Make the following modifications to add the com ponents used with the Power Vent kits This kit can only be used in conjunction with the B C D series versions of Town and Country Fireplaces This installation must conform with local codes or in the absence of local codes with the Nat...

Страница 3: ...he clearances outlined in Figure 1 Minimum Clearances to Combustibles 3 Vertical Through Roof Venting Installation All part numbers in the following section are shown in Figure 3 1 Place the flashing onto the chase and seal using silicone 2 Put a bead of silicone on the underside of the vertical standoff and place it on top of the flashing Align the eight holes and secure both parts to the chase u...

Страница 4: ...TICAL RAIN CAP TO THE POWER VENT TERMINAL AS IT NEEDS TO BE REMOVABLE FOR SERVICING 15 Attach the vent adaptor directly to the appliance with three screws Figure 2 Note The inner pipe does not need to be sealed 16 Connect one of the high temperature silicone tubes to the upper pressure tap on the adaptor Figure 2 Secure with the hose clamp provided and route the tube through any hole back to contr...

Страница 5: ... Drip Shield 8085 Flashing 8082 001 Site Fabricated Chase MUST ALIGN 8 x 1 2 S S 16 Required 8 x 1 1 2 S S 8 Required NOTE Holes to secure rain cap are not predrilled 14 2 Wire w Ground Final Installation Height 21 Junction box cover Silicone all connecting faces 18 Vertical Standoff TCVT 8075 Figure 3 Power vent components ...

Страница 6: ...ors in the black wire loop on the right side of the module and in the orange wire running from the module to the socket labelled pilot on the valve Figure 5 and Figure 6 4 Using the jumper wires provided connect the 120V hot supply wire to one of the black wires from the control module Then connect the hot wire from the power vent blower to the other black wire on the control module Figure 7 The m...

Страница 7: ...es to connect to black wire on module Hot wire from blower Hot wire from 120V supply Figure 7 Control module wiring 310317 20 TCVT PVCV 5056 42665 A Orange wire from module to valve Figure 6 Locating orange wire 7 ...

Страница 8: ...ange wire Figure 8 6 Attach a silicone tube from the upper pressure tap on the power vent adaptor Figure 2 to the low port of the pressure switch Attach the other silicone tube from the lower pressure tap to the high port of the pressure switch 7 Secure the pressure switch in the control box using the screw provided Figure 11 8 Continue with installation and reassemble all of the parts previously ...

Страница 9: ...s switch must be installed in a vertical position and will not function if installed otherwise Figure 10 This power vent system can only run on 115 V AC Before operating the unit the battery backup located behind the wall switch receiver must be removed Pressure Switch Installation TCWS 54CE2 ONLY Figure 12 Pressure switch on flat bracket Pressure switch Orange wire Figure 13 Pressure switch and o...

Страница 10: ...h 3 Attach the silicone tube from the upper pressure tap on the power vent adaptor Figure 2 to the low port of the pressure switch Attach the other silicone tube from the lower pressure tap to the high port of the pressure switch Figure 14 4 Secure the pressure switch in the control box using the screw provided Figure 16 5 Continue with installation and reassemble all of the parts previously remov...

Страница 11: ...the desired location 2 Remove the window from the fireplace 3 Remove access panel from right hand side of the firebox Figure 17 4 Connect 110 V AC electrical supply to the wires installed inside the junction box Figure 18 The fireplace is rated at 110 volts 60Hz 0 25A The optional power vent kit is rated at 115 volts 60Hz 1 8A The electrical wires can be accessed from both inside and outside the j...

Страница 12: ...e interface board Figure 19 7 If not already installed install the burner using the instructions supplied with the burner kit 8 Turn on the gas supply and check that all connections are tight and leak free Transformer Vacuum switch Inside access panel Gas connector Wall switch connector Junction box Module Interface board Power vent switch Regulator board Gas valve Figure 19 Control box ...

Страница 13: ...re 21 on the interface board Figure 19 is set according to which type of evacuating vent system is present If the fireplace is vented without the assistance of a power vent the switch should be set to NV If using a power vent PV must be selected Important Note When switching between NV and PV both the electrical power supply to the fireplace must be turned off and the backup batteries removed to p...

Страница 14: ... Common wire White 1 4 Male Connector 1 4 Male Connector 1 4 Male Connector 1 4 Male Connector 1 4 Female Connector 1 4 Female Connector 1 4 Female Connector 1 4 Female Connector Wiring the Power Vent Kit provided by Town Country Communication wires Main Pilot Low pressure side Orange Orange Pressure switch wire Supplied Power Vent switch wire Supplied Black Black STANDARD AWG 14 2 WIRE OR EQUIVAL...

Страница 15: ...310317 20 TCVT PVCV 5056 42665 A 15 Series D Wiring Diagram ...

Страница 16: ...SIDE COVER LEFT 1 ITEM PART No DESCRIPTION QTY 20 INSIDE COVER 1 21 EXHAUST SHIELD 1 22 SECONDARY RAIN SHIELD 2 23 JUNCTION BOX 1 24 TOP COVER 1 25 EXHAUST SCREEN 1 26 FLASHING 1 27 OUTLET AIR CHANNEL 1 28 DRIP SHIELD 1 30 VENT COLLAR 1 31 VENT EXHAUST ASSEMBLY 1 32 VERTICAL RAIN CAP TCVT 1 33 VERTICAL STANDOFF 1 34 BLOWER WIRING 1 35 CVT 50271c2C2 PRESSURE SWITCH WIRING 1 36 TCVT 50271C2 POWER VE...

Страница 17: ...Universal support SV5SD Floor support SV5BM Wall band SV5RSA Attic radiation shield SV5RSM Wall radiation shield SV5BF Firestop SELKIRK DIRECT TEMP Number Description 1605006 6 Pipe Length 1605009 9 Pipe Length 1605012 12 Pipe Length 1605018 18 Pipe Length 1605024 24 Pipe Length 1605036 36 Pipe Length 1605048 48 Pipe Length 1605082 4 10 Pipe Adjustable 1605215 45 Elbow 1605230 90 Elbow 1605424B Ca...

Страница 18: ...310317 20 TCVT PVCV 5056 42665 A 18 ...

Страница 19: ...310317 20 TCVT PVCV 5056 42665 A 19 ...

Страница 20: ... V9L 6V8 Printed in Canada For Technical Support please contact your retailer 2017 Copyright Pacific Energy Fireplace Products LTD Reproduction adaptation or translation without prior written permission is prohibited except as allowed under the copyright laws ...

Отзывы: