4 TC42.CE
080906-10
For reference only. Consult Manual before installation
26 1/8"
54"
12 5/8"
3/4"
54"
Minimum Combustible Framing Dimensions
Steel Stud Framing Kit Dimensions
Kit supplied with unit
Concrete
Board Detail
Concrete board (or other
non-combustible material)
must extend 12" above and
5" to the sides of the framing
edges.
CONCRETE
BOARD
All other framing
can be done with
conventional lumber
Including Sheetrock
Non-combustible Zone.
Do not install any
combustible material,
electric wiring,
insulation, plastic
vapour barrier or
gas plumbing
within the steel
stud frame.
61 3/4"
21 5/16"
61 3/4"
30 1/8"
3/4"
54"
87 5/16"
54"
54"
NOTE: Fireplace should be in its
fi nal location before framing.
5