Installation- and Operating Instructions
Swing gate operator TURN 10, TURN 20
Страница 1: ...Installation and Operating Instructions Swing gate operator TURN 10 TURN 20...
Страница 2: ...proper function of the gate facility and the safety devices has to be checked Place warning signs and notes of the valid regulations to indicate danger areas With each installation the identification...
Страница 3: ...gate operators A key for emergency release permits the manual opening of the gate in case of e g power failures At rising gate entrances additionally the optional hinge joint has to be mounted Techni...
Страница 4: ...the open and closed gate positions If this is not the case such stopping devices have to be installed or the Tousek piston rod stroke limiting device has to be used The spindle may not be fully exten...
Страница 5: ...point centered to gate leaf Opening to the INSIDE pivotal point not centered inside to gate leaf Mounting at larger columns Mounting measures with different swing gate situations Special case using a...
Страница 6: ...t Before mounting please grease the mounting parts at their pivot points as well as the push rod in extended position Motor sided mounting Put the operator on the assembly part 2 Then insert the cylin...
Страница 7: ...regarding the force adjustment have to be in compliance with the effec tive rules 2c Electric connections and force adjustment Installation The gate facility must be turned off from power supply when...
Страница 8: ...release of the operator at power failure Swing gate operator TURN 10 TURN 20 should it be necessary to release the operator e g in case of power failure please proceed as follows Turn off power suppl...
Страница 9: ...r and general danger areas of the motorised gate have to be secured In this context please follow the EU Machine Directive accident prevention rules and laws as well as applying EU and national standa...
Страница 10: ...brackets 5 Dimensioned sketch Swing gate operator TURN 10 TURN 20 assembly part spindle sided assembly part motor sided measures and technical modifications subject to change 520 617 303 402 940 1141...
Страница 11: ...ic form and within a reasonable time to the market surveillance authorities in response to a duly substantiated request TOUSEK Ges m b H A1230 Wien Zetschegasse 1 Austria is authorized to compile the...
Страница 12: ...at Tousek GmbH Germany D 83395 Freilassing Traunsteiner Stra e 12 Tel 49 8654 77 66 0 Fax 49 8654 57 196 info tousek de Tousek Benelux NV BE 3930 Hamont Achel Buitenheide 2A 1 Tel 32 11 91 61 60 Fax...