![tousek TURN 10 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/tousek/turn-10/turn-10_installation-and-operating-instructions-manual_1140532007.webp)
tousek
/ E_TURN-10-20_42000705 / 16. 05. 2017
- 7 -
Warning
• Before carrying out the electrical connections, the power supply of the gate facility must be turned off
• The safety regulations for electric shock prevention have to be complied.
• The device should only be connected by qualified personnel
• The device should not be used in an explosive environment !
• An all-pole disconnecting mains switch with a contact opening gap of min. 3 mm has to be foreseen. The gate
facility has to be secured according to the valid safety regulations!
• IMPORTANT: The control lines (buttons, radio, photocells, etc.) have to be laid separately from the 230V lines
(supply line, motors, signal lamp).
• The safety standards and regulations regarding the force adjustment have to be in compliance with the effec
-
tive rules !
2c. Electric connections
and force adjustment
Installation
• The gate facility must be turned off from power supply when making the electrical connections.
• The operator has to be connected to the control unit as described in the manual of the control unit.
• For the connection of diverse safety devices, transmitters and other accessories please check the corresponding manuals
(please note cable/wire plan).
•
force adjustment:
the force adjustment of the operator is made through the control unit
(please see manual for control unit)
.
•
end switch:
the operator works without limit switches. The necessary run time is adjusted in the control unit.
2d. Dismounting
the dismounting of the motor is effected in the opposite order of installation.
Please note that before dismounting the operator the power supply has to be turned off !