4
English
inSTaLLaTion ProCeDure
1. F
aucet
b
ody
i
nStallation
Insert flexible hoses and
lift rod through the hole
on deck one at a time
if lift rod is not yet
installed, insert the lift
rod from underside of the
faucet and thread it into
the lift knob�
slide the bracket into
place and secure the spout
with locknuts
adjust the spout to face
forward� hold the spout
in place� Tighten locknuts
Connect flex hoses to
supply lines� make sure
the left hose connects to
the hot supply line and the
right hose connects to the
cold supply line
Bracket
Flex hose
locknut
handle
lift rod
lift knob
hot
inlet
Cold
inlet
DISCONTINUED