7
ENGLISH
Installation Procedure (continued)
TOILET TANK FILL VALVE INSTRUCTIONS
Replacement Procedure
CST405F & CST406F
N
any height adjustments.
1. Shut off the water supply to the toilet.
2. Flush toilet and remove remaining water from tank with a sponge.
3.
Ill. 8
Left
Right
Partial
Flush
Full
Flush
Mounting
Nut
Adjustable
Push Rods
Push Button
Housing
Tank
Lid
Push Button
Assembly
Flush Valve
Tank
Lid
Clip
Lock Nut
Clockwise/
Counterclock-
wise
The rod(s) is too short, the buttons are lowered.
Buttons are at the correct level.
Push
Buttons
Tank Lid
Ill. 11
Ill. 9
Ill. 10
Adjust the rods as necessary by turning the rod 1 full turn (see Ill. 11); to lengthen,
turn the rod counterclockwise; to shorten, turn the rod clockwise.
When the adjustment is completed, tighten the lock nut to secure it (see Ill. 10).
After Installation/Adjustment
push mechanism is working properly.
DISCONTINUED
Содержание CST405F
Страница 2: ...CST406MF D I S C O N T I N U E D...
Страница 12: ...D I S C O N T I N U E D...
Страница 22: ...D I S C O N T I N U E D...