     MAINTENANCE INSTRUCTIONS 
      HALON 1 / 1,2 / 2,5 AIR TOTAL 

ATA 26-24-05   

 

 

 

 

                                       I 74/76-00 dated May 2014 

        Page 6 of 13 

Subject to change without notice  

   

 

               Replaces H 74/76-00 dated October 2012 

Release: October 2012 

Inspection regulations 

In case of security relevant damages the fire extinguisher has to be scrapped immediately.  
If the pressure is reduced the fire extinguisher has to be basically overhauled immediately. 

 

(1)  Pre-flight inspection 

 

Check the pressure gauge. At room temperature the indicator must be in the green section. 
The seal wire on the safeguard lever must not be damaged. 

 
 

(2)  Periodical check  

 

  

The inspection should be carried out every 2 years, or in shorter intervals, depending on  

 

internal regulations. 

 



Integrity of wire seal  

 

 

 

 

 

visual inspection 

 



Condition of extinguisher, mounting bracket and   

 

visual inspection 

 

 

fastening strap 

 



Legibility of label    

 

 

 

 

 

visual inspection 

 



Container pressure / gauge  

 

 

 

 

visual inspection 

 

 

At room temperature the pointer must be in the  

 

 

green section of the dial. 

 



Weight control / scale 

  Permissible deviation: 2% of fill capacity / year, but not more than 10% of fill capacity 

 
 

(3)  Characteristics after 5 years 

 

 

After expiration of 5 years, in case of filling / refilling, the container of the fire extinguisher has  

 

to be inspected inside. Should defects be detected, the extinguisher has to be hydrostatically  

 

pressure tested. 

 
 

(4)  Basic overhaul 

 

Container hydrostatic pressure test 

 

 

All fire extinguishers, listed in that maintenance procedure instruction, must be hydrostatically  

 

pressure tested at regular 10 year intervals. 

The 10 year period starts with the date of  

 

production of the extinguisher

 (see label on back). Should defects be detected at a regular  

 

inspection, this pressure test must be performed earlier. These tests shall only be carried out  

 

by an authorized aviation equipment inspector, well adverted with the safety standards  

 

applicable to this test. Furthermore, also required is an adequate room and the necessary  

 

test equipment. After the hydrostatic pressure test the cylinder has to be desiccated inside.

 

 

 

If the second hydrostatic pressure test is due, the manufacturer recommends to replace the  

 

extinguisher! 

 

Содержание 74-00

Страница 1: ...d October 2012 Release January 2005 MAINTENANCE INSTRUCTIONS WITH ILLUSTRATED PARTS LIST HALON 1 1 2 2 5 AIR TOTAL List of Portable Fire Extinguishers Part No Type 74 00 HAL 1 0 74 20 HAL 1 2 74 21 HA...

Страница 2: ...A 26 24 05 I 74 76 00 dated May 2014 Page 2 of 13 Subject to change without notice Replaces H 74 76 00 dated October 2012 Release August 2003 Inspection Record Inspec No Date issued Performed date Ins...

Страница 3: ...spection record sheet 2 August 2003 Table of contents 3 May 2014 Description 4 August 2003 Operating instructions 5 August 2003 Technical data 5 January 2005 Inspection regulations 6 October 2012 Disa...

Страница 4: ...flammable liquids flammable gases and for fires in the presents of electrical tensions up to 1000 Volt The extinguishers are designed for a one hand operation 2 Range of application a Fire Class ABC...

Страница 5: ...ning strap approx Kg Lbs Nominal pressure by 15 C 59 F Container test press Filling Kg Lbs Discharge time approx Heights 74 00 265mm 10 4 in 82mm 3 2in 1 99 4 39 0 21 0 46 11 bar 156 5 psi 30 bar 427...

Страница 6: ...section of the dial Weight control scale Permissible deviation 2 of fill capacity year but not more than 10 of fill capacity 3 Characteristics after 5 years After expiration of 5 years in case of fill...

Страница 7: ...wrench size 17 Unscrew the siphon tube 220 220A Visually inspect valve and container threads and O ring seat for damage Press operation lever and check mobility of valve spindle Visually inspect insid...

Страница 8: ...lamp The weight of this clamp must be taken into consideration in the weighing process The extinguishing agent is filled according to weight Care must be taken to observe the permissible fill toleranc...

Страница 9: ...to determine the total weight This weight must be entered in the inspection record card and on the extinguisher check note when weighing the extinguisher the weight of seal seal wire and the approval...

Страница 10: ...76 00 dated October 2012 Release May 2014 Illustration 2 Filling Station Schematic arrangement Storage The storage temperature shall not exceed 70 C 158 F Ambient air should be dry and free of corros...

Страница 11: ...mber shown on illustration 3 A stroke in front of the item number indicates that this part is not shown on the illustration 2 Part number Manufacturers original part number 3 Ident number Manufactures...

Страница 12: ...0A 0074 47 0255479 Protective foil 1 50 0074 U12 0621087 Valve assembly HAL 1 1 2 A B 1 50A 0076 U04 0621303 Valve assembly HAL 2 5 C 1 60 E000 11936 220295 Copper seal wire A B C 1 70 E000 00101 1200...

Страница 13: ...MAINTENANCE INSTRUCTIONS HALON 1 1 2 2 5 AIR TOTAL ATA 26 24 05 I 74 76 00 dated May 2014 Page 13 of 13 Subject to change without notice Replaces H 74 76 00 dated October 2012 Release August 2003...

Отзывы: