10
ELEVATE
®
JUMP
TM
OWNER’S GUIDE
ASSEMBLY & INSTALL
STEP 11.
Move the ELEVATE Jump to
the permanent location and position it
properly for full function.
To ensure you have positioned the
ELEVATE Jump with enough clearance
before bolting to the floor, first lower the
Incline Strut to the lowest level. From the
Floor Anchor Bolt Holes measure at least
104 inches [3.56 m] from the Bolt Holes
behind the machine to any walkway, or at
least 140 inches [3.56 m] away from any
wall or obstruction.
Bolt down machine at Front Base through
the Bolt Holes provided on the Anchor
Feet.
NOTE: INSTALLATION MUST BE
CARRIED OUT BY A PROFESSIONAL
INSTALLER.
This will warrant enough room for full
range of motion of the Glideboard at the
rear of the unit.
NOTE: THERE SHOULD ALSO BE AT
LEAST 3 FEET (1 METER) DISTANCE
BETWEEN THE REAR BASE AND A WALL
OR WALKWAY. CONSULT YOUR LOCAL
GOVERNMENT GUIDELINES.
STEP 13.
Anchor the Front Base to the floor using appropriate bolts for your floor as
shown below.
Minimum distance from Floor Anchor Bolt Holes to a wall: 140 inches [3.56 m]
Bolt
Down
Here
Minimum
walkway:
3 feet (1 meter).
See Note above.
WARNING
1. MACHINE WILL MOVE IN-USE IF NOT BOLTED TO THE FLOOR.
2. Bolt unit 104 inches [2.64 m] from the Bolt Holes to any
walkway behind the machine or at least 140 inches [3.56 m]
from any wall or obstruction.
Содержание ELEVATE Jump
Страница 1: ...ELEVATE JUMP TM OWNER S GUIDE...