16
How to Set Holidays in a Scheduled Week of Operation
Operations programmed for a specific day during the week can be temporarily disabled by setting that day as a
holiday.
•
When the set holiday passes, the holiday setting is canceled and operation is resumed as programmed the
following week.
•
Holidays can be selected for the week starting from today’s day. If today is selected as a holiday, the holiday
setting is canceled from the next programmed operation. (Depending on the program, if the program is currently
running, the program may not stop.)
Example Setting
STEP 1
Press the GROUP button to select a group to go on
holiday.
NOTE
•
Depending on installation conditions, group
selection is disabled or set so that all groups are
automatically selected for the holiday feature. If so,
proceed to the next step.
STEP 2
Press the HOLIDAY button.
•
“HL” starts blinking in the present time display area
and today’s day of the week starts blinking.
STEP 3
Select a day as the holiday using the DAY button,
and press the SET button.
•
A “
” appears over the selected holiday.
•
To select other holidays, select a day using the DAY
button and set it with the SET button.
•
If you made a mistake or want to cancel a holiday,
press the CLEAR button.
Today is Thursday and Friday is
set as a holiday.
When Friday comes, the
program set for that day does
not run.
When Saturday comes,
Friday’s holiday setting is
canceled.
OI-915-16-EG
915_TCB-EXS21E.book Page 16 Wednesday, August 1, 2007 1:26 AM
Содержание TCB-EXS21TLE
Страница 162: ...915_TCB EXS21E book Page 162 Wednesday August 1 2007 1 26 AM ...
Страница 182: ......