3 Diagnostic Programs
3.9 Communication
Connect Timeout:
Define the time that slave connecting to master (in seconds);
Test Timeout:
Define the time that testing each transfer rate(in seconds);
SIR Test:
Choose the transfer rates to be checked in Slow IR;
FIR Test:
Choose the transfer rates to be checked in Fast IR.
Below are the operation steps:
Prepare a Master whose IrDA works normally, then run the test item in
‘Comm/IrMaster’ under Diagnostics menu; The master stays here to wait
for slave requesting.
Prepare a slave. User should choose the test item ‘Comm/IrSlave’ and set
parameters.
Below is the Slave Testing window.
52
Satellite M20 Maintenance Manual
Содержание Satellite M20
Страница 10: ...x Satellite M20 Maintenance Manual ...
Страница 11: ...Chapter 1 Hardware Overview ...
Страница 12: ...1 Hardware Overview 1 ii Satellite M20 Maintenance Manual ...
Страница 35: ...2 Troubleshooting 2 Chapter 2 Troubleshooting 2 i Satellite M20 Maintenance Manual ...
Страница 72: ...Chapter 3 Diagnostic Programs ...
Страница 75: ......
Страница 141: ......
Страница 143: ...Chapter 4 Replacement Procedures ...
Страница 144: ...4 Replacement Procedures 4 ii Satellite M20 Maintenance Manual ...
Страница 151: ...4 Replacement Procedures Satellite M20 Maintenance Manual 4 ix ...
Страница 152: ......
Страница 239: ...6000 1 次 Appendices ...
Страница 240: ...Appendices App ii Satellite M20 Maintenance Manual ...
Страница 292: ...Appendices Apx E Key Layout E 2 Satellite M20 Maintenance Manual E 3 Korea Keyboard Figure E 3 Korea keyboard ...