– 9 –
5. REFRIGERANT PIPING DIAGRAM
RAV-M240A-E
Fig. 5-1
(indoor unit B)
(Indoor unit A)
(RAS-09EK)
Evaporator
Evaportator
(RAS-09EK)
Refrigerant pipe (Gas slde)
φ
9.5m
m
Packed valvex2
Two way valvex2
20SRA1
20SRB1
Capillary
φ
2 x 800 x2
Capillary
φ
1.7 x 600
Two way valve
Dr
yer
Condenser
Compressor1
20SRD1
Accumulator
Packed valve
CYCLE 1
20SRCI
(Indoor uni
t C)
Evaporator
(Indoor uni
t D)
Evaporator
(RAS-09EK)
(RAS-09EK)
Packed valve x 2
Two way valve x2
20SRA2
20SRB2
Two way valve
20SRC2
Dr
yer
Condenser
Compressor2
20SRD2
Accum
ulator
Packed valve
CYCLE 2
Refrigerant pipe (Liquld side)
φ
6.4m
m
Capillary tube
φ
1.7 x 600
Outdoor
Unit
φ
2 x 300
Capillary
φ
2x 300
Capillary
Refrigerant pipe (Liquld side)
φ
6.4mm
Refrigerant pipe (Gas slde)
φ
9.5m
m
Capillary
φ
2 x 800 x2