![Toshiba RAS-3M23GACV-E Скачать руководство пользователя страница 97](http://html.mh-extra.com/html/toshiba/ras-3m23gacv-e/ras-3m23gacv-e_service-manual_1135026097.webp)
– 97 –
No.
9
Part name
Pulse motor
valve coil
Procedure
1. Detachment
1) Perform step 1. in
2
, all the steps in
3
and 1.
in
5
.
2) Release the coil by pulling it up from the
electronic control valve body.
2. Attachment
1) When assembling the coil into the valve body,
ensure that the coil anti-turn lock is installed
properly in the pipe.
<Handling precaution>
When handling the parts, do not pull the leads.
When removing the coil from the valve body, use
your hand to secure the body in order to prevent the
pipe from being bent out of shape.
Remarks
1. Detachment
1) Perform work of item 1 of •, and ‚.
2) Remove the front cabinet, and put it down so
that fan guard side directs downward.
Perform work on a corrugated cardboard,
cloth, etc. to prevent flaw to the product.
3) Remove the hooking claws by pushing minus
screwdriver according to the arrow mark in the
right figure, and remove the fan guard.
2. Attachment
1) Insert claw of the fan guard in the hole of the
front cabinet.
Push the hooking claws (9 positions) by hands
and fix the claws.
All the attaching works have completed.
Check that all the hooking claws are fixed to
the specified positions.
10
Fan guard
Hooking claw
Minus screwdriver
Coil inserting
position
Coil anti-turn
lock position
Coil
anti-turn
lock
Содержание RAS-3M23GACV-E
Страница 99: ... 99 MCC 1438 ...
Страница 100: ... 100 MCC 818 ...