No. Part name
Procedure
Remarks
⑥
Compressor
1) Perform works from
①
to
⑤
.
2) Recover the refrigerant gas form the outdoor unit.
3) Remove partition.
(ST1TØ4×10L 5pcs.)
4) Remove the sound-insulation material.
5) Remove terminal cover of the compressor, and
disconnect lead wire of the compressor and the
comp. thermo. assembly.
6) Remove pipe connected to the compressor with
a burner.
• Take care to keep the 4 way valve away from
naked flames. (Otherwise, it may malfunction.)
7) Remove screws.
(ST1TØ4×10L 1pc. : fix to heat exchange)
(ST1TØ4×10L 2pcs. : fix to valve fixing plate)
8) Pull upward the refrigeration cycle.
9) Remove NUT (3 pcs.) fixing the compressor.
・
Precautions when assembling the compressor.
Tighten the compressor nuts using a tightening
torque of 9 N•m.
⑦
Reactor
1) Perform works from
①
to
③
.
2) Remove reactors.
(ST1TØ4×10L 4pcs.)
Compressor
Partition
Valve
fixing
plate
Reactors
FILE NO. SVM-18020
- 112 -
Содержание RAS-2M14U2AVG-E
Страница 122: ...TOSHIBA CARRIER ETHAILANDJ C0 1 LTD ...