Page 16
User Manual
1. Prepare the Window
2. Prepare the Air Conditioner
Installa
tion
Instruc
tions
Lower sash must open sufficiently to allow a clear vertical opening (see dimension H in Table 1).
Side louvers and the rear of the AC must have clear air space to allow enough airflow through the
condenser for heat removal. The rear of the unit must be outdoors, not inside a building or garage.
Mounting Hardware
3/4’’ (or 1/2”)
Screws
(7)
Lock Frame
(For Wooden windows)
(2)
Sash Lock
(1)
Window sash
seal foam
(1)
Weather stripping
10”*3/4”*1/12”
(5)
Lock Frame
(For Vinyl-Clad windows)
(2)
Before installing the unit, the top rail must be assembled on the unit for some models.
A: Remove the air conditioner from the carton and place on a fl at surface.
B: Remove top rail. from the packaging material as shown in Fig. D.
3/8” Screws
(4)
Top Rail
(1)
Top Rail Hardware
Weather stripping is only for
ENERGY STAR models only.
Packaging
Fig. D
Top Rail
Top Rail
Fig. D
NOTICE
Содержание RAC-WK0512CMRU
Страница 32: ...Page 32 User Manual ...