Note: “Double Command Blocking (DCB_RCV_OR in Table 4.3-8)” is an operation
philosophy. It can be used to protect the substation. The user can configure it
using GR-TIEMS.
3
Note: Detection of event “device-travelling (Traveling OR in Table 4.3-8)” signifies that
other operators are changing the status of one or more devices. Thus, device
operation by the IED should be inhibited whilst the event is detected.
4
Note: If an IED is in the process of issuing a trip (GEN.TRIP in Table 4.3-8) command,
all control operation is blocked until the trip operation has been completed.
Tripping can be introduced by the protection function if the IED has protection
functions.
5
Note: The criteria “unmatched conditions” is determined when the “Test-bit status” in a
command is not identical to the “IED test status”.
6
Note: The user must program the PLC logic “Control hierarchy condition”. The Control
hierarchy condition provided by the user-programmed PLC logic may be 43R/L;
the user can connect it with PLC connection point “S4301_CTRL_RIGHT” of
7
Note: To identify the PLC connection points of the other SOFTSW logics, see Table 4.3-5.
(viii)
Signal name and number
Note: The user should note the meaning of the following abbreviations as shown in
column “M/O” of each table:
“O” indicates that the signal is provided for the optional use.
“M” indicates that the user should map/set/configure the signal; otherwise, the
user may experience an operational failure if the default settings is used.
“N/A” indicates that the user cannot change the state of the signal.
Table 4.3-11 Output signals on starting operation “Off to On”
Signal Number
Signal Name
Description
522001 890A011F5A
CBK_OEC_CHG
“Off to On” operation start in CBK
522001 890A021F5A
ICB_OEC_CHG
“Off to On” operation start in ICB
522001 890A031F5A
SCB_OEC_CHG
“Off to On” operation start in SCB
522001 890A041F5A
S4301_OEC_CHG
“Off to On” operation start in SOFTSW1 (S43-01)
522001 890A051F5A
S4302_OEC_CHG
“Off to On” operation start in SOFTSW2 (S43-02)
522001 890A061F5A
S4303_OEC_CHG
“Off to On” operation start in SOFTSW3 (S43-03)
…
….
….
522001 890A401F5A
S4361_OEC_CHG
“Off to On” operation start in SOFTSW61 (S43-61)
Table 4.3-12 Output signals on starting operation “On to Off”
Signal Number
Signal Name
Description
522001 8A0A011F5B
CBK_FEC_CHG
“On to Off” operation start in CBK
522001 8A0A021F5B
ICB_FEC_CHG
“On to Off” operation start in ICB
522001 8A0A031F5B
SCB_FEC_CHG
“On to Off” operation start in SCB
522001 8A0A041F5B
S4301_FEC_CHG
“On to Off” operation start in SOFTSW1 (S43-01)
522001 8A0A051F5B
S4302_FEC_CHG
“On to Off” operation start in SOFTSW2 (S43-02)
Содержание GR 200 Series
Страница 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Страница 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Страница 1369: ...6F2S1915 0 46 GRZ200 Soft 031 032 1348 Unit mm Panel cut out for 1 2 case size Figure 2 2 3 Panel cutout figure 1 2 size case ...
Страница 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Страница 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Страница 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Страница 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Страница 1520: ...6F2S1915 0 46 GRZ200 Soft 031 032 1499 Appendix 9 Matrix between VCT terminals and relay applications ...
Страница 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Страница 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Страница 1563: ......