– 81 –
7. HYDRO UNIT INSTALLATION MANUAL
Engineering Data Book
Water charging
Charge water until the pressure gauge shows 0.2 MPa (2 bar).
Hydraulic pressure may drop when the trial run begins. In that case, add water.
Air may enter if the charged hydraulic pressure is low.
Loosen the purge valve cap by two turns to release air.
Loosen the cap of the pressure relief valve to release air.
Water may come out of the pressure relief valve.
Release the air completely from the water circuit. Failure to do so may disable correct operation.
Water quality
The water used must satisfy EN directive 98/83 EC.
Piping insulation
It is recommended that insulation treatment be applied to all pipes. To perform optional cooling operation, apply
insulation treatment of 20 t or more to all pipes.
▼
Fig. 7-18
Loosen 2 turns for
proper venting
19-EN
Содержание ESTIA HWS-1102H-E
Страница 3: ...2 1 INTRODUCTION ...
Страница 7: ...6 2 SYSTEM OVERVIEW ...
Страница 10: ...9 3 SYSTEM SPECIFICATION ...
Страница 12: ...11 4 HYDRO UNIT ...
Страница 44: ...43 5 OUTDOOR UNIT ...
Страница 57: ...56 6 HOT WATER CYLINDER ...
Страница 63: ...62 7 HYDRO UNIT INSTALLATION MANUAL ...
Страница 107: ...105 8 OUTDOOR UNIT INSTALLATION MANUAL ...
Страница 108: ...AIR TO WATER HEAT PUMP Outdoor Unit Model name HWS 802H E HWS 1102H E HWS 1402H E Installation manual ...
Страница 131: ...129 9 OWNER S MANUAL ...
Страница 146: ...Air to Water Heat Pump Engineering Data Book Aug 2009 ...