4
© 2005 - 2008 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO163/203
GENERAL OPERATION
4 - 9
4.4
Flow Chart
4.4.1
Immediately after the power is turned ON
Fig. 4-3
NO
NO
YES
YES
YES
NO
NO
"C21"
YES
YES
YES
Heater lamp ON
DC power ON
Scan motor ON
Main switch ON
Call for service
Restart
Paper jam
Call for service
"C26"
"E03"
A
B
Peak detected?
Exit sensor ON?
Home position
detected?
13 - 15 seconds
elapsed?
Registration sensor
ON?
Cover is open?
07/02
Содержание e-STUDIO163
Страница 6: ......
Страница 10: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Страница 66: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved COPY PROCESS 3 14 ...
Страница 86: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved CONTROL PANEL 5 8 ...
Страница 120: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved LASER OPTICAL UNIT 8 8 ...
Страница 130: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved DRIVE UNIT 9 10 ...
Страница 180: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved DRUM RELATED SECTION 11 22 ...
Страница 202: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved DEVELOPMENT SYSTEM 12 22 ...
Страница 222: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved FUSER EXIT UNIT 13 20 ...
Страница 230: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved POWER SUPPLY UNIT 14 8 ...
Страница 233: ...15 2005 2008 TOSHIBA TEC CORPORATION All rights reserved e STUDIO163 203 PC BOARDS 15 3 6 PWA F FUS Fig 15 6 ...
Страница 234: ...e STUDIO163 203 2005 2008 TOSHIBA TEC CORPORATION All rights reserved PC BOARDS 15 4 ...
Страница 235: ......
Страница 236: ......