Smart Manager (Web Type)
Owner’s Manual
22
-EN
Checking/Changing an Execution Schedule 1
<Checking/Changing an Execution
Schedule in the [List] screen>
[1] Checking/changing an Execution
Schedule for each Air Conditioner or
Multiple Air Conditioners in a Batch
1.
Click
to switch to the [List] screen.
2.
Select the air conditioner(s) you wish to check the
execution schedule for by any one of the groups
below.
a) Air conditioners by floor in a batch
b) Air conditioners by tenant in a batch
c) Air conditioners by area in a batch
d) By each air conditioner
Click
to
list the air conditioners by floor, tenant, or area
in the [List] screen. Place the cursor on the floor
name for the air conditioners (for batch by floor)
or the air conditioner name (by each air
conditioners) you wish to operate and right-click.
The [Operation menu] appears.
3.
Click the Change Operating Schedule in the
[Operation menu].
The [Change Operating Schedule] screen appears.
4.
Click the date tab you wish to check or change.
5.
Next, click the No. field of the air conditioner(s) you
wish to check or change to check or change the
setup.
Reference:
The execution schedules can be checked or changed with the same procedure as that used for creating the execution
schedules.
This can be done in either the [Setup] screen or the [List] screen.
2-b
[List] screen
3
2-a
1
[Change Operating Schedule]
screen
4
5
2-c
2-d
Содержание BMS-SM1280HTLE
Страница 44: ...DE93919201 ...