1600XP Series Quick Installation Guide

4

Initial UPS Startup

The first time the UPS is activated after being shipped from the factory, an initialization program will require the 

operator to input the following parameters.  The UPS display operation is explained in detail on pages 32-62 

The first screen during the initial startup sequence requires the operator to select the nominal input voltage.  

1. 

Select from 208V, 230V, or 240V, and press the 

Write 

key.  If the command has been accepted, the word 

“Successful” will appear at the bottom left side of the display.

Repeat the process in step 1 in selecting the 

2. 

Rated Vout.

Repeat the process in step 1 in selecting the

3. 

 Input Frequency

.

Use the keypad to type in the 

4. 

current date

 in the format: 

Mon 10/05/2009. 

and press 

Write

.

Use the keypad to type in the 

5. 

current time

 in 12 hour format: 

12:15 PM

 and press 

Write

.

The Main screen is now displayed. Verify the UPS is in 

6. 

BYPASS

 mode.  The mode (lower right side  of the 

display)  should display 

Bypass

.  If it does not display 

Bypass,

 press and momentarily hold the 

STOP

 button. 

With the UPS in bypass mode, cycle power to the UPS as follows:

7. 

At the rear of the UPS switch the main circuit breaker MCCB to OFF.

• 

Leave the UPS off until the DC bus is safely discharged (approximately 5-10 minutes).

• 

Restart the UPS by switching the main circuit breaker ON.

• 

The table below summarizes the initialization parameters: 

ID

Command

Options

111

Rated Vin

Select from 208V, 230V, or 240V, and press 

Write

.

215

Rated Vout

Select from 208V, 230V, or 240V, and press 

Write

.

141

Input Frequency

Select from 60Hz or 50Hz, and press 

Write

.

634

UPS Date

Input the date in this format: 

Mon 10/05/2009. 

and press 

Write

.

635

UPS Time

Input the current time in 12 hour format: 

12:15 PM

 and press 

Write

.

FAQ Sheet

Following are some Frequently Asked Questions concerning installation of the 1600EP Series UPS.

NOTICE

The batteries for the UPS must be installed while the UPS is energized.  

FAQ #1

My Output is ~85V.

Problem:  Output is wired across the incorrect output terminals.  The voltage across terminals 5 – 6(X2 – N) will 

be approximately 85V.

Solution:  The correct 120V output terminals are 4 –  6 (X1 –  N), and 7 –  6 (X3 –  N).  

FAQ #2

My Output is other than 85, 120, 208 or 240V

.

Problem:  The Terminal strip jumper may be installed incorrectly for the incoming voltage.
Solution:  Check that the Jumper wire/buss strip is installed correctly for the incoming voltage.

Toshiba Contact Information:

  Toshiba Industrial Division, 13131 West Little York Road, Houston, TX  77041 

Tel: US 800-231-1412, Canada 800-872-2192, Mexico 01/800/527-1204                                              www.toshiba.com/ind

Содержание 1600XP SERIES

Страница 1: ...orized to safely energize de energize ground lockout and tag circuits and equipment and clear faults 2 in accordance with established safety practices Be trained in the proper care and use of protective equipment such as safety shoes rubber gloves hard hats safety 3 glasses face shields flash clothing etc in accordance with established safety practices Be trained in rendering first aid 4 Be knowle...

Страница 2: ...UPS will not influence some sensitive devices that are operating near by If such interference is experienced the UPS should be installed farther away from the affected equipment and or powered from a different source than that of the affected equipment After ensuring that all power sources are turned off and isolated in accordance with established lockout tagout procedures 10 connect the power sou...

Страница 3: ...ba DO NOT add any additional jumpers Note 3 8 22 kVA UPSs have a jumper bus bar Output Terminal Connections Connect the load to the output terminals according the load voltage requirements See the Output Terminal Voltages table to the right Wire Size and Tightening Torque Use the following table to select the recommended wire size and terminal lug tightening torque for I O wire connections Item Te...

Страница 4: ...r MCCB to OFF Leave the UPS off until the DC bus is safely discharged approximately 5 10 minutes Restart the UPS by switching the main circuit breaker ON The table below summarizes the initialization parameters ID Command Options 111 Rated Vin Select from 208V 230V or 240V and press Write 215 Rated Vout Select from 208V 230V or 240V and press Write 141 Input Frequency Select from 60Hz or 50Hz and ...

Отзывы: