Mar. 1998 © TOSHIBA
18 - 1
1550/1560 UNPACKING PROCEDURE
18. UNPACKING PROCEDURE
18.1 Unpacking and Set-up Procedure for the 1550
A. Unpacking Procedure
1. Open the carton and take out the accessory
package and other packing materials. The ac-
cessory package includes the following parts:
•
Copy receiving tray
•
Set-up report (U.S.A., Canada, Europe)
•
Operator’s manual
•
Fuser unit lever caps (2 pcs.)
•
Set-up instruction
2. Open the plastic bag and holding the lifting
bands, take out the machine from the carton.
3. Remove all packing materials from the outside
and inside of the machine.
4. Pull out the cassette and take out the packing
material located at the front side.
5. Remove the screw fastening the carriage.
Note: For the screw fastening the carriage, a
coin screw is used. So, after loosening
it with a suitable coin, the screw can be
removed by manually turning it.
•
Remove the carriage fastening screw lo-
cated in the left-top cover.
Lifting bands
Plastic bag
Accessories
Coin screw
Содержание 1550
Страница 11: ...1550 1560 GENERAL 2 4 Mar 1998 TOSHIBA ...
Страница 112: ...1550 1560 DRUM 9 12 Mar 1998 TOSHIBA 1 16 48 CLK SI1 LT OUT1 1 2 64 Timing chart ...
Страница 167: ...Mar 1998 TOSHIBA 13 25 1550 1560 OPTIONAL 13 7 4 PC board assembly PWA F PFU ...
Страница 188: ...Mar 1998 TOSHIBA 14 21 1550 1560 CIRCUIT DIAGRAMS Control Panel Circuit PWA F PNL 4 4 ...
Страница 189: ...1550 1560 CIRCUIT DIAGRAMS 14 22 Mar 1998 TOSHIBA 14 4 Fuser Circuit PWA F FUS ...
Страница 192: ...Mar 1998 TOSHIBA 16 1 1550 1560 PC BOARD 16 PC BOARD ASSEMBLY 16 1 PWA F LGC 16 2 PWA F FUS 100V series 200V series ...
Страница 193: ...1550 1560 PC BOARD 16 2 Mar 1998 TOSHIBA 16 3 PWA F PNL 16 5 PWA F LRG 100V series 200V series 16 4 PWA F AES ...