
Page
29
1
2
3
4
5
6
STEP
23
Route the ball end of WEIGHT STACK CABLE
(56) around the two PULLEYS in the BASE
(19) as shown. (Also see inset.)
Loop the ball end of WEIGHT STACK CABLE
(56) around the lower PULLEY in the DUAL
FLOATING PULLEY (1) as shown. (Also see
inset.)
Route the WEIGHT STACK CABLE (56)
around the two PULLEYS in the BASE (19) and
thru the cable slot in the LEFT BASE SHROUD
(5) (shroud not shown). (Also see inset.)
NOTE: Make sure the cable runs in the
groove of the pulleys and to the inside of
the welded cable retaining brackets.
THRU LEFT
BASE
SHROUD (5)
TO LEG CURL/
EXT
1
19
56
CABLE