Page
26
1
2
3
4
5
6
STEP
21
Remove the bolt and 3-1/2” PULLEY from the
3-1/2” SINGLE FLOATING PULLEY (36) as
shown.
Route one end of the LEG CURL/LEG EXT
CABLE (65) thru the bushing on the 3-1/2”
SINGLE FLOATING PULLEY (36) and as-
semble the CABLE END SLEEVE (58) as
shown.
Re-install the bolt and 3-1/2” PULLEY to the 3-
1/2” SINGLE FLOATING PULLEY (36).
Route the other ball end of LEG CURL/EXT
CABLE (65) thru the slot on the BASE (2)
around the PULLEYS on the LEG CURL/EXT
ARM (25) and thru the hole on the LEG CURL/
EXT KNEE HOLD DOWN (26) as shown.
Assemble the CABLE END SLEEVE (58) to
the ball end of the LEG CURL/EXT CABLE
(65) as shown in the detail.
NOTE: CABLE must
pass between PULLEY
and BOLT.
26
58
65
2
36
25
26
58
65
58