MOWER DECKS
7-49
Z580/Z593/Z595 Diesel Service Manual
7
Gearbox Assembly Installation
1. Apply anti-seize compound to both gearbox as-
sembly shafts (Fig. 865).
3. Apply thread locking compound to all 4 pulley set
screws. Start the set screws into the pulley hubs
(Fig. 867).
Fig 865
PICT-3913a
Fig 867
PICT-3917a
Slide the gearbox drive pulley onto the gearbox drive
shaft (Fig. 868).
Note: Install the pulley so that the pulley hub is
fl ush + .03” (0.76mm) with the end of the
gearbox shaft.
2. Install a key into the gearbox drive shaft keyway
(Fig. 866).
Fig 868
PICT-3918a
Fig 866
PICT-3915a
Содержание Z580-D
Страница 1: ...LCE Products Z580 D Z593 D Z595 D Diesel Z Master Service Manual ...
Страница 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 9: ...vi Z580 Z593 Z595 Diesel Service Manual TABLE OF CONTENTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 11: ...SAFETY INFORMATION 1 2 Z580 Z593 Z595 Diesel Service Manual 1 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 87: ...CHASSIS 3 64 Z580 Z593 Z595 Diesel Service Manual 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 309: ...MOWER DECKS 7 86 Z580 Z593 Z595 Diesel Service Manual 7 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 310: ...Z580 D Z593 D Z595 D Diesel Z Master Service Manual Form No 492 9188 ...