
Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
Boom (sold separately)
1
1
Chain (sold separately)
1
Install the boom and chain.
2
No parts required
–
Check the fluid levels.
3
No parts required
–
Charge the battery.
1
Installing the Boom and Chain
Parts needed for this procedure:
1
Boom (sold separately)
1
Chain (sold separately)
Procedure
Important:
There are several boom and chain size
configurations available. Refer to you Authorized
Service Dealer to obtain the appropriate boom and
chain to meet your requirements.
1. Stop the engine and remove the key.
2. Remove the bolt, 2 saddle washers, and nut securing
the spoils auger and remove the auger (Figure 3).
Save the fasteners for future use.
Figure 3
1.
Spoils auger
6.
Adjusting bolt
2.
Boom
7.
Jam nut
3.
Bolts
8.
Arm on the drive head
4.
Double washer
9.
Drive sprocket
5.
Nuts
3. Remove the 2 bolts, nuts, and double washers from
the sides of the boom (Figure 3).
4. Loosen the adjusting bolt and jam nut (Figure 3).
5. Slide the boom over the arm on the drive head.
6. Install the 2 bolts, nuts, and double washers removed
in step 3 through the boom and arm, but do not
tighten them.
7. If the chain is not connected, connect the links by
pressing or hammering the clevis pin supplied with
the chain through the links.
Important:
To avoid bending the chain links,
place blocks under and between the links when
hammering the clevis pin through.
8. Secure the clevis pin with the cotter pin supplied
with the chain.
12
Содержание TRX-26
Страница 7: ...Measured values were determined according to the procedures outlined in EN ISO 20643 7...
Страница 8: ...Slope Indicator 8...
Страница 46: ...Schematics Electrical Schematic Model 22970 Rev A Electrical Schematic Model 22971 Rev A 46...
Страница 47: ...Electrical Schematic Model 22974 Rev A 47...
Страница 50: ...Notes 50...
Страница 51: ...Notes 51...