Engine Installation (continued)
g300622
Figure 25
10. Install the throttle and choke cables to the throttle control plate. Secure with 8
mm HH bolt securing the throttle and choke cables to the throttle control plate.
g300620
Figure 26
11. Install the muffler shield and rear engine guard. Secure with 10 (T-40)
self-tapping screws securing the rear engine guard and muffler shield to the
chassis. Torque screws to 17–22.5 N • m (150–200 in-lb).
Engine: Service and Repairs
Page 4–16
TIMECUTTER® Service Manual
3433-938 Rev A
Содержание TIME CUTTER ZS 4200S
Страница 2: ...Revision History Revision History Page 2 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 6: ...Preface Page 6 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 26: ...Troubleshooting General Troubleshooting Page 3 6 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 50: ...Engine Service and Repairs Page 4 24 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 154: ...Chassis Service and Repairs Page 5 104 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 188: ...Mower Deck System Service and Repairs Page 7 16 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 212: ...Electrical System Service and Repairs Page 8 24 TIMECUTTER Service Manual 3433 938 Rev A ...
Страница 215: ... Drawing Rev A Sheet 1 3433 938 Rev A Page A 3 Electrical Schematic g316875 ...