Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
Grinder control lever
1
1
Jam nut
1
Install the grinder control lever.
2
No parts required
–
Check the fluid levels.
3
No parts required
–
Charge the battery.
1
Installing the Grinder
Control Lever
Parts needed for this procedure:
1
Grinder control lever
1
Jam nut
Procedure
1.
Thread the jam nut onto the grinder control lever
(
).
g013175
Figure 3
1.
Grinder control lever
3.
4-pin connector
2.
Jam nut
2.
Thread the grinder control lever into the
receptacle on the control panel (
).
3.
With the trigger oriented forward, tighten the jam
nut against the receptacle to secure the lever in
place (
).
4.
Connect the wire on the lever to the 4-pin
connector under the control panel (
).
2
Checking the Fluid Levels
No Parts Required
Procedure
Before starting the engine for the first time, check
the engine-oil and hydraulic-fluid levels. Refer to the
following sections for more information:
•
Checking the Engine-Oil Level (page 24)
•
Checking the Hydraulic-Fluid Level (page 37)
3
Charging the Battery
No Parts Required
Procedure
Charge the battery; refer to
(page 29)
for more information.
10
Содержание STX-26
Страница 43: ...Schematics g013418 Electrical Schematic Rev A 43...
Страница 44: ...g025169 Hydraulic Schematic Rev A 44...
Страница 45: ...Notes...
Страница 46: ...Notes...