
Procedure for Charge Pump Relief Check:
1. Make sure hydraulic oil is at normal operating tem-
perature by operating the machine for approximately 10
minutes.
2. Make sure machine is parked on a level surface with
the cutting units lowered. Make sure engine is off and
the parking brake is engaged.
CAUTION
Make sure that all hoses are free of the fly-
wheel after installation.
5. Operate engine at full speed (3200
100 RPM).
3. Make sure the hydraulic tank is full.
6. Make sure hydraulic oil is at operating temperature.
CAUTION
Operate all hydraulic controls to relieve
system pressure and avoid injury from
pressurized hydraulic oil.
7. Make sure that traction pedal and lift valve are in
neutral and the parking brake is engaged.
8. Pressure gauge should read from 100 to 150 PSI.
If Specification is not met, replace charge relief valve.
9. Shut off engine.
10. Disconnect gauge and T–connection from the
4. Disconnect hose from the front fitting of the charge
pump and hose. Reconnect hose to the pump.
pump leading to the control valve. Connect T–connector
and gauge to the pump and hose fitting.
Reelmaster 2300–D/2600–D
Page 4 – 25
Hydraulic System
Hydraulic
System
Содержание REELMASTER 2300-D
Страница 2: ...This page is blank ...
Страница 4: ...This page is blank ...
Страница 10: ...Safety Page 1 6 Reelmaster 2300 D 2600 D ...
Страница 12: ...Equivalents and Conversions Product Records and Manuals Page 2 2 Reelmaster 2300 D 2600 D ...
Страница 14: ...Maintenance Interval Chart Product Records and Manuals Page 2 4 Reelmaster 2300 D 2600 D ...
Страница 38: ...Engine Page 3 20 Reelmaster 2300 D 2600 D ...
Страница 158: ...Wheels and Brakes Page 6 8 Reelmaster 2300 D 2600 D ...
Страница 185: ...This page is blank ...
Страница 186: ...Commercial Products The Toro Company ...