![Toro ProLine 30526 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/toro/proline-30526/proline-30526_operators-manual_1132004016.webp)
16
Installing the Control Arm
Rods
1. Insert control arm swivel thru hole in speed control
crank and secure with hairpin cotter (Fig. 9).
1
2
3
m–5994
Figure 9
1.
Control arm
2.
Swivel
3.
Speed control crank
2. Repeat this procedure for the opposite side.
Installing the Speed Control
Rod
1. Move the speed control lever fully forward (Fig. 10).
1
Figure 10
1.
Speed control lever
2. Install speed control rod to right side of speed control
lever (under control panel) with a hair pin cotter
(Fig. 11).
1
2
m–5996
3
Figure 11
1.
Speed control rod
2.
Speed control lever
3.
Hair pin cotter
3. Install yoke end of speed control rod to the speed
control crank with a clevis pin and hairpin cotter
(Fig. 12).
3
1
5
2
4
Figure 12
1.
Speed control rod
2.
Yoke
3.
Speed control crank
4.
Hair pin cotter
5.
Clevis pin
Installing the Fuel Tank
1. Apply retaining adhesive, such as Loctite RC 609 or
680, to the threads of the 2 threaded studs (5/16 x
7/8”in.) supplied in loose parts. Install studs into the
two left holes in underside of fuel tank