C.
Check and tighten all bolts, nuts, and
screws.
Note:
Repair or replace any parts that
are worn or damaged.
D.
Check the condition of all spray hoses.
Note:
Replace any hoses that are worn
or damaged.
E.
Tighten all hose fittings.
F.
Paint all scratched or bare metal
surfaces with paint is available from your
Authorized Service Dealer.
G.
Store the machine in a clean, dry garage
or storage area.
H.
Remove the key from the
STARTER
switch and put the key in a safe place
out of the reach of children.
I.
Cover the machine to protect it and keep
it clean.
Removing the Sprayer and
Tank Skid
Lifting equipment capacity:
408 kg (900 lb)
DANGER
The sprayer tank assembly represents a
stored energy hazard. If not properly retained
when installing or removing the assembly
it can move or fall and injure you or other
bystanders.
Use straps and an overhead lift to support
the sprayer tank assembly during installation,
removal, or any maintenance when the
retaining fasteners are being removed.
Preparing the Center Console
1.
Disconnect the battery cables from the battery;
refer to
9 Installing the Sprayer Fuse Block
(page 22)
.
2.
Separate the fuse block of the sprayer from
the fuse block of the machine and disconnect
the wiring between the 2 fuse blocks; refer to
Installing the Sprayer Fuse Block (page 22)
.
3.
Remove the wiring harness from J-clips; refer to
8 Installing the Control Console and Electrical
Harness (page 21)
.
4.
Loosen the hand knob that is located below
the console and remove the hairpin; refer to
Installing the Control Console to the Machine
(page 21)
.
5.
Remove the console from the console-mounting
bracket and align the pivot pin on the control
console with the storage bracket at the front tank
strap ; refer to
Installing the Control Console to
the Machine (page 21)
and
.
6.
Assemble the console to the bracket and secure
the pivot pin to the bracket with the hairpin; refer
to
Installing the Control Console (page 16)
.
Installing the Jackstands
Lifting equipment capacity:
408 kg (900 lb)
1.
Align the front jackstand with the jackstand
receiver at the front of the tank (
g028422
Figure 105
1.
Clevis pin (1/2 x 3 inch)
4.
Hairpin (5/32 x 2-5/8 inch)
2.
Jackstand receiver
5.
Front jackstand
3.
Lock knob
2.
Insert the jackstand into the receiver until the
middle hole in the horizontal jackstand tube is
aligned with the hole in the top of the receiver
(
).
3.
Insert the clevis pin (1/2 x 3 inch) into the holes
in the jackstand and receiver and secure the
clevis pin with a hairpin (5/32 x 2-5/8 inch).
4.
Thread a lock knob into the receiver tighten the
knob by hand (
5.
Align the rear jackstand with the rear jackstand
receiver (
76
Содержание Multi Pro WM 41240
Страница 79: ...Schematics g255886 Flow Diagram Sprayer System DWG 125 0699 Rev B 79...
Страница 80: ...Notes...
Страница 81: ...Notes...
Страница 82: ...Notes...