Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Unfold the handle.
Screws
3
2
Chute assembly
1
Install the discharge chute.
1
Unfolding the Handle
No Parts Required
Procedure
1. Loosen the handle knobs, pull out the “U”-shaped
handle locks until you can move the handle freely,
and rotate the handle to the operating position
(Figure 4).
Figure 4
1.
“U”-shaped handle lock (2)
2.
Handle knobs
2. Insert the end of the “U”-shaped handle lock into
the open hole in the handle and tighten the handle
knobs until they are snug (Figure 5).
Figure 5
Important:
Ensure that you do not pinch or
kink the control cable or the Quick Shoot™
cables (Figure 6).
Figure 6
1.
Control cable
2.
Quick Shoot™ cables
6
Содержание CCR 6053 ES Quick Clear
Страница 21: ...Notes 21 ...