
Maintenance
37
9.
Loop blade control cable around the two roller
guides and hook the end into the hole in the idler
arm on the mower (Fig. 46).
Figure 46
1.
Blade control cable
2.
Idler arm
3.
Roller guides
1
2
3
10. Move the height-of-cut lever (deck lift) into the
“D” notch to make it easier to install the
height-of-cut lift assist spring.
11. Hook the height-of-cut lift assist spring onto the
retaining bolt (Fig. 47), using the spring tool
provided with the machine.
Figure 47
1.
Spring
2.
Bolt
3.
Spring tool
1
2
3
12. Check side-to-side blade level; refer to
Side-to-Side Mower Leveling, page 39.
Содержание 71202
Страница 7: ...Safety 5 Slope Chart Read all safety instructions on pages 2 4...
Страница 8: ...6...
Страница 22: ...Maintenance 20 Wiring Diagram C 1301...