in the direction of where the tank drain ball valve
assembly is mounted to the frame.
G005877
1
2
3
Figure 49
1.
New drain, installed
3.
Fitting facing front, left
side of the machine
2.
Wrapped threads, 90
degree elbow fitting
13. Install the existing drain hose over the barb and
secure it with a hose clamp.
21
Installing the Bypass Line
Parts needed for this procedure:
1
Mixing tee
3
Retainer forks, small
1
Bypass hose
1
Procedure
1. Loosen the retaining bolts on the right side of
the machine for both front and back tank straps.
This will allow the tank to be raised slightly to
accommodate the removal and installation of
components.
2. Locate the valve manifold at the back of the machine
and stretches across the top of the boom frame
uprights. The existing bypass line is connected to the
right side of the valve manifold (Figure 50). Remove
the small retainer fork and disconnect the bypass
hose. Retain the small fork at this location for later
use.
G005897
2
1
Figure 50
1.
Bypass line, existing
2.
Valve manifold
3. Under the machine, locate the opposing end of
bypass hose where it connects to the under side
of the tank. Remove medium retainer fork and
23