![Toro 34215 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/toro/34215/34215_operators-manual_1133878028.webp)
g027304
Figure 28
1.
Locking sleeve
4.
Drop-rate cam
2.
Gate cable
5.
Rate-gate linkage
3.
Ball stud
2.
Pull the cable off the ball stud (
).
3.
Rotate the drop-rate cam past position-9 so
that the slot in the cam aligns with the linkage
(
).
4.
Fully push the rate-gate linkage rearward (
5.
If there is material in the hopper allow the
material to pour into a shallow pan; when the
hopper is empty, remove the pan.
Connecting the Rate-Gate Linkage
1.
Pull the linkage out until it clears the drop-rate
cam (
).
2.
Move the wide-distribution impeller-gate lever
forward.
3.
Attaching the cable to the ball stud at the gate
lever(
Assembling the Impeller
1.
Assemble impeller onto the impeller shaft and
secure the impeller with the drive pin.
2.
Align the holes in the front cover with the clip
nuts in the chassis and secure the cover with
the 4 thumbscrews that you removed in step
of
Removing the Impeller (page 26)
.
28
Содержание 34215
Страница 75: ...Schematics g027149 Electrical Schematic Rev A 75...
Страница 76: ...g027148 Electrical Diagram Rev A 76...
Страница 77: ...g033525 Sprayer System Schematic Rev A 77...
Страница 78: ...Notes...
Страница 80: ......