![Toro 30403 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/toro/30403/30403_operators-manual_1133186010.webp)
7.
Install the height of cut collars onto the height
of cut rods and secure with the clevis pins and
hairpin cotters (
). Position the head of
the clevis pin toward the front of the deck, if
possible.
8.
Install a bolt (1/2 x 3/4 inch) and a washer to top
of each height of cut rod (
).
6
Connecting the PTO Shaft
to the Cutting Unit Gearbox
No Parts Required
Procedure
1.
Slide the male PTO shaft into the female PTO
shaft (
). Align the mounting holes in the
gear case input shaft with the holes in the PTO
shaft and slide them together.
g012230
Figure 6
1.
PTO shaft
3.
Gear case
2.
Bolts and locknuts
4.
Roll pin
2.
Secure them with a roll pin (
).
3.
Tighten the bolts and nuts (
7
Greasing the Machine
No Parts Required
Procedure
Before operating the machine, it must be greased to
ensure proper lubricating characteristics; refer to
Greasing the Machine (page 10)
. Failure to properly
grease the machine will result in premature failure of
critical parts.
10
Содержание 30403
Страница 24: ...Notes ...