8.
Release the rocker switch to proceed to the next
step in the sequence (
).
g231715
Figure 17
9.
Hold the lower section of the rocker switch
(
) until the cam assembly rotates to the
selected row under the pipe box (
g210462
Figure 18
g232379
Figure 19
10.
Release the rocker switch to proceed to the next
step in the sequence (
).
g231716
Figure 20
11.
Hold the lower section of the rocker switch
(
) until the elevator puts the pipe back
in the pipe box and the cam rotates to the home
position (
g210462
Figure 21
g232380
Figure 22
12.
Release the rocker switch to start the pull-pipe
process again.
5