background image

Note:

Make sure all O–rings are lubricated and in

position before installing fitting.

5.

Connect the hose to the 45 degree fitting (Figure 3).

6.

Remove and discard hose secured to 45 degree fitting
on lower pump port and to tee fitting under seat base
(Figure 4 and Figure 5).

G010142

1

2

3

4

Figure 4

1.

Upper hose

3.

45 degree fitting

2.

Pump

4.

Lower hose

7.

Install hydraulic hard line to tee fitting under seat base.
Position line as shown in Figure 5.

2

1

G010143

Figure 5

1.

Tee fitting

2.

Hydraulic hard line

Note:

Make sure all O-rings are lubricated and in

position before installing fittings.

8.

Install grommets and spacers to bulkhead bracket as
shown in Figure 7.

9.

Using bulkhead bracket as a template and dimensions
shown in Figure 6, locate, mark and drill 2 holes (0.281
inch diameter) into frame tube. Dimensions shown in
Figure 6 are for location reference of bracket.

G010145

1

2

3

4

5

6

Figure 6

1.

Bulkhead bracket holes

4.

5.59 inch

2.

0.281 diameter hole

5.

1.06 inch

3.

6.44 inch

6.

1.50 inch

Note:

Figure 6 is shown as viewed from under

machine.

10.

Mount bulkhead bracket to frame with 2 hex-head
thread-forming screws.

11.

Assemble bulkhead bracket to hydraulic hard line with
nuts and washers, supplied in kit, as shown in Figure 7.

G010144

5

4

1

2

4

6

3

7

8

9

Figure 7

1.

Bulkhead bracket

6.

Hydraulic hard line

2.

Grommet

7.

Hose

3.

Spacer

8.

Upper motor fitting

4.

Washer

9.

Lower motor fitting

5.

Nut

3

Отзывы: