Tornatech DJP Скачать руководство пользователя страница 11

 

 

11 

 

 

Содержание DJP

Страница 1: ...1 INSTALLATION AND MAINTENANCE MANUAL FOR JOCKEY PUMP CONTROLLERS ...

Страница 2: ...2 3 Technical Documents 2 Installation 1 Introduction Table of Contents JP Manual EN ...

Страница 3: ...Contents 4 Introduction 4 Types of Jockey Pump Controllers 4 Methods of starting stopping 5 6 Installation 6 Preventive maintenance and test 8 VISUAL INSPECTION 9 OPERATIONAL INSPECTION 9 10 Technical Documents 10 ...

Страница 4: ...main pump and controller caused by unnecessary frequent operation Types of Jockey Pump Controllers JOCKEY PUMP CATALOGUE NUMBER MODEL n EXAMPLE JP3 460 2 3 60 Model Prefix JP3 Voltage 460 V HP Rating 2 HP Phase 3 Frequency 60 Hz MODEL JP This jockey pump controller with across the line starter is specifically designed to the control jockey pump that maintains the designed water pressure in fire pu...

Страница 5: ...ances and eliminates unnecessary starting of the fire pump with all associated consequences i e high power drain load shedding undesirable alarms The presence of a 100 standby jockey pump associated with a circuit that alternates lead standby jockey pumps each time provides full back up and easy maintenance of the system any pump can be manually selected as lead Methods of starting stopping METHOD...

Страница 6: ...TANT PRECAUTIONS Prior to mounting the controller and making any field connections 1 Verify that the following information is compatible with other related equipment on the project Controller rating label informations AC line voltage phase and frequency Motor horse power voltage phase and frequency System pressure 2 Open the door of the enclosure After removing the cardboard protections inspect th...

Страница 7: ... to NFPA20 The water connection is on the bottom of the controller DANGER HAZARDOUS VOLTAGE IS PRESENT IN THE ENCLOSURE WHICH WILL CAUSE SEVERE PERSONAL INJURY OR DEATH MAINTENANCE OR START UP SHOULD BE PERFORMED ONLY BY EXPERIENCED LICENSED ELECTRICIANS ONLY QUALIFIED PERSONNEL SHOULD WORK ON OR AROUND THIS EQUIPMENT STEP 7 POWER ON AND SET IPD BOARD The front door mounted IPD membrane is describ...

Страница 8: ...configuration mode The controller will start if the START button is pressed Use the LEFT RIGHT buttons to navigate between the parameters Press the ENTER CONFIG button to select a parameter This will display the current value Use the UP DOWN buttons to change the selected parameter value The speed of the changing values will accelerate if the buttons are maintained Press the ENTER CONFIG button to...

Страница 9: ...ck for leaks on pressure transducer and piping Inspect door for proper alignment and function of door locks Inspect tightness of all connections Inspect tightness of all terminal jumpers Inspect controller grounding Inspect relays contactors and timers for any evidence of damage Inspect motor contactor power contacts Inspect tightness of all mounting nuts and screws OPERATIONAL INSPECTION YES NO C...

Страница 10: ...10 Technical Documents ...

Страница 11: ...11 ...

Отзывы: