![Topper TOPAZ OMEGA Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/topper/topaz-omega/topaz-omega_rigging-instructions_1129665006.webp)
6
3:3 Pull the jib halyard in order to raise the jib, and then cleat
the halyard off on the right side of the mast. In order to apply
the most rig tension, sweat the jib halyard as shown.
3:4 Once the rig tension has been applied,
the forestay can be moved back from the bar
at the front and then tied off to the mast.
3:5 Thread the jib sheets up as shown.
3:1 Attach the foot of the jib to the furler at the front
of the boat. Ensure the furler is fully wound up.
TIP: Wrap some electrical tape around the furler.
This will protect the gennaker from the sharp split ring
and help to prevent rips in the sail.
3:2 Do the same for the head of the jib onto the furler on the jib
halyard. Again, wrap some tape around it.
NOTE: To ensure swivel movement is not restricted,
avoid taping across the swivel
Rigging Instructions - RAISING THE JIB