2.2 Basic excavation
1. Before excavation, the arm cylinder should be at 90° to the arm, and the bucket 30° to the ground being
excavated. Only in this situation, can each cylinder achieve maximum power.
2. To excavate any soft soil, the bucket should be angled with the soil at 60°, thereby increasing work
efficiency.
2.3 Lower excavation.
Keep the angle between bucket base and the bevel at 30°, and retract the arm to start work.
2.4 Upper excavation
Keep the bucket blade vertical to the ground, and retract the arm to start work.
2.5 Ditching is carried out in seven steps, as shown in figure.
Arm stretch
Boom down
Left turn
Right turn
Bucket Load
Bucket
Unload
Arm Back
Boom Up
Содержание TW08 MINI
Страница 4: ...4 Quick hitch Narrow bucket Log grab Mechanical thumb Auger Ripper Rake...
Страница 5: ...5 Section II Main parameters...
Страница 11: ...11 Hydraulic system structure of SDTW 0 8T excavators I Rotary motor...
Страница 12: ...12...
Страница 15: ...15...
Страница 16: ...16 Section IV Schematics of main valve Reserved Steering Arm Traveling Front shovel Traveling Boom Bucket...
Страница 17: ...17 Section V Electrical system diagram...