
10
11
EN
4) Explanation for Max Work Load test results.
If the display volt value is above 12.8V (for 24V batteries it will be 25.60V), the load
system is working well.
If the display volt value is below 12.8V (for 24V batteries it will be 25.60V), please
check the engine belt and if electrical short circuit.
5. Charging Test
5.1
Before Test
The engine must be
ON
during test.
5.2
Steps
1) Select the “
4. CHARGE SYSTEM
” test on the main menu.
2) Press and hold “
ENTER
”, and turn on loads and speed up to 2500-3500rpm.
3) Press “
ENTER
” again to test charging system.
5) Explanation for charging system test results.
Please refer to the chart below to confi rm the test results.
Status
Headlamps & A/C
OFF (Depress
Accelerator)
Headlamps & A/C
ON (Depress
Accelerator)
13.3V-15.0V
26.5V~30.0V
Normal
13.0V~13.2V
26.0V~26.4V
General
12.8V~12.9V
25.6V~25.9V
Attention
<12.7V
13.4V~14.6V
13.2V~13.3V
<13.1V
<25.5V
26.8V~29.2V
26.4V~26.7V
<26.3V
Inspection ASAP
Normal
Attention
Inspection ASAP
12V Battery
Voltage
24V Battery
Voltage
Engine Performance
Reference Table (for 12V battery)
4) Press the “
ESC
” to exit.
3) Press “
ENTER
” to complete FULL LOAD TEST. On the display is current volt:12.86V, standard
volt: 12.80V, and minimum volt: 12.30V (for 24V batteries it will be 25.60V).
Содержание BT500P
Страница 1: ......
Страница 2: ...Content...
Страница 32: ...60 61 LED 1 AH CCA 1 BATT CAPACITY ENTER 2 ENTER 3 QUICK TEST ENTER 4 AH AH ENTER 5...
Страница 37: ...70 Q ATV A ATV Q SOH SOC RES A SOH SOC RES Fran ais...