Integral Promotional Serve Over - Akdeniz
12.
Maintenance
Before starting any maintenance or cleaning, disconnect the equipment from the electrical
power supply.
If the power control board and condensing units are placed far from each other(remote),
make sure that the control board is switched-off during the cleaning of the condensation
unit. Do not touch the hot and moving parts. The use of heavy-duty gloves is recommended.
Cut the electric supply off before starting maintenance.
Put gloves on before starting maintenance.
Do not touch hot and moving parts.
Amount of the ice in evaporator must be checked every day in first week after installation
and twice a week after first week. If abnormal amounts of ice are noticed, the cabinet must
be set to regular working conditions by manual defrosting.
12.1 Cleaning :
12.1.1 General:
A regular and thorough cleaning regime is essential for the efficient and hygienic operation
of your display case .
Before undertaking any cleanin operation, always turn the case off and if possible disconnect
from the main supply.
Never use abrasive or caustic cleaning as above.
SHOCK HAZARD !!!
TURN OFF THE POWER BEFORE
START TO CLEANING !!!
Содержание ISLA
Страница 5: ...Integral Promotional Serve Over Akdeniz 3 Sectional Drawings ...
Страница 14: ...Integral Promotional Serve Over Akdeniz Setting parameters on the PJEZ S Preliminary Configurations ...
Страница 21: ...Integral Promotional Serve Over Akdeniz 15 Troubleshooting ...
Страница 22: ...Integral Promotional Serve Over Akdeniz 16 Electrical Wiring Diagram for Akdeniz ...
Страница 23: ...Integral Promotional Serve Over Akdeniz 17 Declaration of Conformity ...
Страница 24: ...Integral Promotional Serve Over Akdeniz ...
Страница 25: ...Integral Promotional Serve Over Akdeniz ...