OPERATION
ASSEMBLING LEVELING DEVICE (Fig.5)
Assemble the leveling device into one of the footpads.
1. Insert countersink screw (M) into pad(P).
2. Thread countersink screw (M) with pad (P) into first nut
(N).
3. Place washer (Q) and second nut (N) on top of footpad
(F). Thread countersink screw (M) through footpad (F),
washer (Q), and second nut (N).
Attach Footpads
Slide one footpad (F) onto the bottom of each leg. (One
footpad will include the leveling device.)
Align the large corner radius of the footpad and the corner
radius of footpad on angle as shown in Fig.6.
Leveling
To level the work station on an uneven surface, turn the screw in the leveling device. Move the
leveling device in and out to raise or lower the level of the footpad.
NOTICE:
If necessary, interchange position of footpads on the work station in order to obtain
maximum leveling capability.
ASSEMBLING THE TABLETOP
Assemble the tabletop in one of three positions. For a solid
surface, place the edges of the boards together. The
remaining two positions are for mounting larger bench tools
(Fig.7)
To assemble the tabletop:
1. Place the two, thick boards (G,H) print-side-down on a
flat surface and spaced to fit the mounting footprint of your tool (Fig.8).
Содержание 240-1575
Страница 13: ...EXPLODED VIEW...