21
To view the number of GOod part relay operations press:
COUNT GOOD
To view the number of DEcrease relay operations press:
COUNT DE
To view the number of INcrease relay operations press:
COUNT IN
Each stroke of the press the channel 0 load falls into one of 5 zones determined by the 4
process control setpoints. Each of these 5 zones has a counter which increments
whenever the load is in its zone. The key sequence consists of three keys always starting
with count. Below are the sequences and the setpoints.
COUNT REJECT HIGH - (loads above setpoint #3)
COUNT DE GOOD
- (loads between #3 and #4)
COUNT GOOD GOOD - (loads between #4 and #5)
COUNT IN GOOD
- (loads between #5 and #6)
COUNT REJECT LOW - (loads below setpoint #6)
Two more counters round out the total of 11. One counter counts the number of strokes
in the decrease zone ( all loads above setpoint #4) and the other counts the strokes in the
increase zone (everything below setpoint #5).
To view the decrease zone count press the key sequence:
COUNT DE DE .
To view the increase zone count press the key sequence:
COUNT IN IN .
4. THE ALARM COUNTERS
a. HIGH COUNTERS -
COUNT HIGH
Each time the HIGH SETPOINT is exceeded by the operating mode load in a
particular channel (0-2) this event is counted. A running total of HIGH ALARM
COUNTS is thus kept for each channel. This counter counts up to 9,999 before
rolling over to 0 again. The count increases regardless of the bypass status of the
channels.
To display the HIGH ALARM COUNT, the key sequence is "COUNT HIGH".
Channels 0-2 will now show the number of HIGH ALARMS which have
occurred since the HIGH ALARM COUNT was last cleared. The HIGH LEDs
are lit to indicate HIGH count as opposed to low count. To clear the counts,
Содержание MoniTTor N269
Страница 1: ......
Страница 2: ......
Страница 3: ...N269 Installation and Operations Manual...
Страница 4: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 9: ...2...
Страница 10: ...3...
Страница 11: ...4...
Страница 13: ...6...
Страница 14: ...7...