TOELLNER TOE 9260 Series Скачать руководство пользователя страница 2

 

Contents 

Page 

 

 

TOELLNER Electronic Instrumente GmbH

 

1.

 

Introduction ............................................................................................................. 3 

1.1

 

Required test equipment ....................................................................................................... 3 

2.

 

Tests according to standard LV 124 ..................................................................... 5 

2.1

 

LV 124, E-10, Short interruptions .......................................................................................... 5 

2.2

 

E-10, Short interruptions 

 reference measurements ............................................................ 6 

2.3

 

LV 124, Test E-13, Pin interruption ....................................................................................... 6 

2.3.1

 

E-13, interruption of signal pins .......................................................................................... 6 

2.3.2

 

E-13, interruption of signal pins 

 reference measurements............................................... 7 

2.3.3

 

E-13, interruption of ground pins ........................................................................................ 8 

2.3.4

 

E-13, interruption of ground pins 

 reference measurements ............................................. 8 

3.

 

Tests according to standard LV 148 ................................................................... 10 

3.1

 

LV 148, E48-09, Short interruptions .................................................................................... 10

 

 

 

 

Содержание TOE 9260 Series

Страница 1: ...al Line Interruptions for Automotive Tests Electronic Switch TOE 9260 9260E AN001_Rev00 doc R TOELLNER ELECTRONIC INSTRUMENTE GMBH Gahlenfeldstrasse 31 58313 Herdecke Germany 49 0 23 30 97 91 91 Fax 4...

Страница 2: ...E 10 Short interruptions reference measurements 6 2 3 LV 124 Test E 13 Pin interruption 6 2 3 1 E 13 interruption of signal pins 6 2 3 2 E 13 interruption of signal pins reference measurements 7 2 3 3...

Страница 3: ...ice of the right switch i e power switch resp signal line switch of the TOE 9260 Reference measurements according to the requirements of the LV 124 2013 1 1 Required test equipment Commonly the follow...

Страница 4: ...ence resistors 1 100 and 1 k of low inductance 5 tolerance to perform reference measurements The use of the following reference resistor kits is recommended Item No Item name TOE 9260 100 Reference Re...

Страница 5: ...een the power supply and the IN sockets of the TOE 9260 the internal capacitor at the input of the TOE 9260 should be activated by setting the DIP switch INPUT C to ON So the shortest possible rise an...

Страница 6: ...possible 2 3 LV 124 Test E 13 Pin interruption The test E 13 has to be applied to signal pins as well as to ground pins For both situations the test assemblies are explained in the following 2 3 1 E 1...

Страница 7: ...istor TOE 9260 104 may be connected to power source and signal line switch by provided suitable cables Due to the 1 A current limit of a signal line switch the measurement with the 1 resistor shall be...

Страница 8: ...nce resistor of 1 5 resp 1 k 5 of low parasitic inductance To avoid the addition of too high cable inductivity the reference resistor shall be connected close to the signal line switch by closely spac...

Страница 9: ...resistor at a voltage level of 1 V If the DUT is tested with two paralleled signal line switches 2 3 3 the reference measurements have to be carried out with the same configuration of paralleled switc...

Страница 10: ...ould be activated by setting the DIP switch INPUT C to ON So the shortest possible rise and fall times of the voltage at the DUT are achieved If an artificial network between the power supply and the...