Version-01
Cal.VJ76B
⑤
Insulator
・
Setting position
Notes: To Insulate between the battery connection (+) and the battery connection (-),
Insulator should be put at the three pin securely as bellow.
Pin
Insulator
⑥
Train wheel bridge
・
Setting position
Notes: Since the fifth wheel and pinion and step rotor are made of plastics, take care not to damage
them in disassembling and reassembling.
Fourth wheel and pinion
Pin for setting wheel
Fifth wheel and pinion
Minute wheel and pinion
Setting wheel
Setting wheel
Step rotor
Third wheel and pinion
Third wheel and pinion
Minute wheel and pinion
Reset pin
Step rotor
Fifth wheel and pinion
Center wheel and pinion
Fourth wheel and pinion
Clutch wheel
⑦
Train wheel setting lever
・
Setting position
Notes:
・
Catch the part of spring of the Train wheel setting lever to the pin like as below.
・
Take care not to deform the spring potion of the Train wheel setting lever.
Train wheel setting lever
TECHNICAL GUIDE
7
Clutch wheel