W W W . T M G I N D U S T R I A L . C O M P 6 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Step 2 : Assemble all trusses
The building includes 15 trusses : (1) front truss, (1) rear truss, and (13) middle
trusses. The front and the rear truss are to install with the fabric panel (#23).
Parts used to install the front and rear truss in this step (refer to picture 2):
-
(1x2) Peak arch tube (#1)
-
(2x2) Upper rafter tube (#2A)
-
(2x2) Shoulder tube (#3A)
-
(2x2) Sidewall tube (#4)
-
(1x2) Ceiling cross bar (#11)
-
(2x2) Hex bolt (#19)
-
(12x2) Half round head bolt (#18)
Picture 2