OPERATION INSTRUCTIONS
(5) As followed, shovel blade 3 moves, press the "three clicks", shovel blade 3
declines, dropping to 1/3 full stroke cylinder.
(6) As followed, shovel blade 2 moves, press the "two clicks", shovel blade 2
declines, dropping to 1/3 full stroke cylinder.
(7)Repeat the steps from (4),(5),(6) to let the shovel blades decline to 1/3 of the
stroke cylinder.
(8)Repeat the steps from (4),(5),(6) to let the shovel blades decline to full of the
stroke
cylinder.
(9)Operate
the
arms
of
the
skid
steer
loader
to
lift
the
tree
spade,
let
the
tree
spade
along
with
the
tree
out
of
the
ground,
the
operator
will
move
the
tree
to
the
designated
place.
(10)Select
the
"one
up",
"two
up",
"three
up",
to
let
the
shovel
blade
rise,
and
then
let
the
tree
separate
from
the
tree
spade,
finally,
complete
the
transplanting
task.
www.tmgindustrial.com
Toll Free:1-877-761-2819
P 11 / 14