W W W . T M G I N D U S T R I A L . C O M P 5 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Mark the ground in the final building location with a line showing the
positions of base plates, front, and rear doors. All lines should be drawn from
center to center of all baseplate tubes.
Baseplates : all baseplates must be installed firmly with expansion bolts (#16)
on this step (figure 1).
Parts used in this step :
- (4) Baseplates (#5L,#5R)
- (30) Baseplates (#7)
- (4) Baseplates (#6)
- (110)
Expansion bolts (#16)
Figure 1