background image

 

W W W . T M G I N D U S T R I A L . C O M                   P 1 / 2 0               T o l l   F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

 

Main Specifications : 

     

          - Overall assembled size : W9.15 x L24 x H4.57 (m) / 30 x 78.7 x 15(ft) 

        - Front and back roll up door : W3.65 x H3.3 (m) /12 x 10.8(ft) 

 

                               

Prior to assembly 

Please read the instructions carefully before installation. It is important to follow your 
local safety regulations and industry standards during installation. Regulations may 
include but are not limited to : 
 
              -    Safety helmets, protective eyewear, and clothing 
                -    Safety harnesses for all elevated workers 
                -    Proper ladder, cage, and safety operation 
 
Check all components and parts before installation. All parts are marked with a part 
number, please refer to the parts list to make sure you have all parts. 
 
Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not 
make any alterations to the structure. Do not hang any weights on the frame during 
installation, including parts. We are not responsible for any damages or injuries 
caused by inappropriate installation, unauthorized modifications or extreme weather.   

 

This building is not intended for human occupancy.   

 

It is recommended to tape or add foam/rubber on the frame where joints connect and 
where it touches the cover. This will help extend the life span of the cover. 

 

Read the following item list carefully and count the number of items to ensure that 
all parts are included prior to setup. 

Installation steps 

Step 1 : Review the whole structure and choose the proper installation site 
 

Choose a solid flat level ground area to set up the building. Do not install the 
building on soft ground, wetland, uneven surfaces, sloped surfaces, or on top of 
structures that are not rated to hold its weight.   
 
We strongly recommend that you build the structure on a solid foundation such as 
cement and use anchor bolts on all baseplates.   
 
Be aware of the surrounding area. Do not set up the building near snowdrifts, open 
flames or exposed electrical wires. Do not keep heat sources near the fabric cover. 
Keep the building surroundings clear at all times. 

Содержание ST3080V-1.0

Страница 1: ...W W W T M G I N D U S T R I A L C O M P 0 2 0 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Страница 2: ...ng parts We are not responsible for any damages or injuries caused by inappropriate installation unauthorized modifications or extreme weather This building is not intended for human occupancy It is r...

Страница 3: ...mm 30 3A Lower rafter tube front and rear truss 58xL2800mm 4 4 Roof purlin horizontal tube 42xL1440mm 80 4A Middle truss connectors W50xL180mm 150 4B Front and rear connectors W50xL121mm 10 4C Self ta...

Страница 4: ...2 11B Rope pulley W35xL85mm 2 12 Bottom tension bar front and rear cover 32xL2560mm 4 13 Diagonal bracing bar for 1st and last span 42xL2070mm 4 13A Tube clamp 58mm 8 14 Top cover tension tube for bo...

Страница 5: ...R I A L C O M P 4 2 0 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 21 Water plug 32mm 16 22 Top cover 1 23 Front and rear cover panel 2 24 Braided rope 8x160m 1 bundle 25 Tension band W38xL800mm 34 26 Scratc...

Страница 6: ...line showing the positions of base plates front and rear doors All lines should be drawn from center to center of all baseplate tubes Baseplates all baseplates must be installed firmly with expansion...

Страница 7: ...ss 1 rear truss 17th truss and 15 middle trusses The front and rear trusses are installed with the fabric panel 23 Both front and rear truss include the following parts Connect all tubes with bolt 18...

Страница 8: ...7 7 6 1 2 8 1 9 The 15 middle trusses include the following parts Connect all tubes with bolt 18 refer to figure 3 1x15 Peak arch tube 1 2x15 Upper rafter tube 2 2x15 Lower rafter tube 3 1x15 Ceiling...

Страница 9: ...n all 17 trusses on the ground as Figure 4 when the assembly is all completed and before moving to next step and then wrap 26 around the sharp points of the joint to avoid friction between the fabric...

Страница 10: ...to lift the trusses but you have to make sure it is safe and have enough manpower We recommend 3 to 5 people to pull the truss up from different directions When the truss is up tie the ropes to the h...

Страница 11: ...r to Step 3 to put up the rest trusses connect all 5 purlins 4 with bolt 17 and secure all bolts firmly on each span before going to next truss figure 6 Parts used in this step 80 Roof purlin 4 150 Mi...

Страница 12: ...W W W T M G I N D U S T R I A L C O M P 1 1 2 0 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Figure 6 2...

Страница 13: ...2 8 1 9 Step 5 Install the diagonal bracing bars 13 Connect diagonal bracing bar 13 on the first and last span to lower rafter tube 3A and 3 with tube clamp 13A use bolt 19A figure 7 Parts used in thi...

Страница 14: ...he front and rear trusses figure 8 Install rope pulley 11A on the right 11B on the left as shown Parts used in this step 2x2 Door frame lower tube 8 2x2 Door frame upper tube 9 2x2 Door frame middle t...

Страница 15: ...ong the tube Refer to Figure 9 and 10 on how to attach the rope and tie to the tube Insert the dropping tube 15 into the bottom groove pocket on the door cover Tie two ropes 20 separately on both side...

Страница 16: ...st go through the upper wheel of pully 11A then pull both ropes together slowly and start to lift the door cover Tie both ropes to the corner baseplate Now the door cover is up When you drop down the...

Страница 17: ...ot install the cover during windy weather Unpack the top cover and place it along one of the long sides of the structure Use 3 to 5 ropes 24 to pull the top cover 22 the top of the structure 2 or 3 pe...

Страница 18: ...retched and tied to the front and rear truss by rope going through the flap grommets on the cover Start from the top center and go toward both side on each end Add or cut the rope as needed Pull and s...

Страница 19: ...the cover on the structure from both sides figure 13 Insert tension tubes 14 slowly into the bottom groove pocket on both long sides Add the water plug 21 on the first tension tube to avoid tearing th...

Страница 20: ...right back and forth to make sure it is square and centered Cut the groove pocket where it aligns with ratchet 7A and use tension band 25 to pull tension tube 14 to ward the ratchet and secure it Eve...

Страница 21: ...g on the fabric cover must be removed as soon as possible If snow becomes solid ice on the cover it will increase the weight on the roof and may collapse the shelter or reduce the life span Keep the s...

Отзывы: